Mike Silvers Tag Page 2


Articles associated with this tag:

FirstBack1234NextLast11-20 of 55
Upcoming Solar Panel Changes in the Florida Building Code 8th Edition (2023) Tue, Nov 07, 2023 The new 8th Edition (2023) of the Florida Building Code (FBC) includes a few changes to sections that cover Solar Energy Systems. They are fairly limited in their scope but they do present an opportunity to review. In this article, we will examine re... Read More

A Weak Link in Florida’s Roofing Underlayment Requirements Sun, Oct 01, 2023 FRSA labored hard over the last three years to improve the underlayment code in Miami-Dade County. The Florida Building Commission approved new code over the opposition of Miami-Dade County building officials but the enforcement battle has yet to be ... Read More

Underdeck Clearance of Lines, Pipes, Conduits and Cables Have Been Ignored — Until Now Thu, Aug 10, 2023 Mike Silvers, CPRC, Owner, Silvers Systems Inc. and FRSA Director of Technical Services A contractor contacted me a few weeks ago hoping to get some help with a problem they had encountered. During a reroofing operation, they had penetrated a water ... Read More

Words Matter: Roofing-Related Definition Changes Tue, Jul 11, 2023 Mike Silvers, CPRC, Owner Silvers Systems Inc. and FRSA Director of Technical Services Since we were children, we’ve been told “words matter”. Then we go to school and learn “sticks and stones may break my bones, but words wi... Read More

Steep Slope Underlayment Changes in the FBC 8th Edition Sat, Jul 01, 2023 Mike Silvers, CPRC, Owner, Silvers Systems Inc and FRSA Director of Technical Services Most of the underlayment requirements outlined in the new 8th Edition of the Florida Building Code (2023), other than those in the HVHZ (High Veloci... Read More

Mitigation and Inspections Forms - To Sign or Not to Sign Thu, Jun 15, 2023 Mike Silvers, CPRC, Owner, Silvers Systems Inc. and FRSA Director of Technical ServicesIt seems as though the requests for roofing contractors to attest to certain facts or opinions in writing continue to increase with each year. Whether it... Read More

Tile Underlayment – Where We Are and How We Got Here Sun, Apr 09, 2023 Mike Silvers, CPRC, Owner of Silvers Systems Inc. and FRSA Director of Technical Services   Changes in roofing underlayment requirements have evolved in dramatic ways over the last several decades, particularly when it comes to tile ... Read More

Current and Coming Changes to the "25% Rule" Fri, Mar 24, 2023 Mike Silvers, CPRC, Silvers Systems Inc., and FRSA Director of Technical Services Recently, the Florida Legislature, as part of SB-4D, added an exception to the sections of the Florida Building Code (FBC) which are often referred to as&nbs... Read More

When You Think You Have Seen It All...Think Again Tue, Feb 14, 2023 Mike Silvers, CPRC, Silvers Systems Inc. and FRSA Director of Technical Services Approximately a month after Hurricane Ian made landfall on the southwest coast of Florida, I received a group email from the Roofing Industry Committee o... Read More

Team FRSA Pushes Through the Tape at the End of the FBC Modification Marathon - January 2023 Fri, Jan 06, 2023 The Florida Building Commission (FBC) met in December to consider the Technical Advisory Committees (TACs) recommendations for final changes to the 8th Edition 2023 Florida Building Code. Read More

FirstBack1234NextLast11-20 of 55